Import Lifecycle — App Walkthrough

A guided tour of the platform: from planning cycles and split ratios through shipment tracking, letters of credit with data entry, demurrage container management, GRN, and landed cost — all in one system.

1366 x 900 H.264 MP4 English subtitles (WebVTT) Strict navigation — no goto after login

What is covered

  1. Login as Admin (the only page.goto in the script)
  2. Dashboard — live KPI cards and bar charts
  3. BOM — Bill of Materials per product cycle
  4. Stock — per-part inventory snapshot
  5. Orders — Planning Cycles list; click Jul-26 cycle
  6. Jul-26 Split Ratios — edit variant demand distribution and save
  7. Run Engine — navigation gap (see note below)
  8. Allocation Adjustments — navigation gap
  9. Sign Off — navigation gap
  10. Tracking — Shipments list and clicking a shipment for its detail
  11. LC — New LC form (fill PFI, LC number, value) + Edit Stages on existing LC
  12. Demurrage — New Container form + Record Return on existing container
  13. GRN — Goods Received, discrepancy checking
  14. Landed Cost — per-component cost pivot
  15. Notification bell and user account menu

Navigation gaps (2)

These pages are not reachable via visible links or buttons in the current UI. No page.goto was used; steps were captioned and skipped.